Are you aware that you have two charging options for your Genesis GV60 Premium? You can either charge it using a regular wall plug or a charging station. However, while on the road, public charging can only be done through a charging station as a wall plug will not suffice. The time it takes to charge your EV depends on the type of charging station or EVSE used, as well as your EV's maximum charging capacity. Refer to the table below to view all available charging options for your Genesis GV60 Premium, including the estimated time required to charge the battery from empty to full.
Europe
When it comes to charging electric vehicles (EVs) in Europe, the process can differ depending on the country. Some European countries predominantly use 1-phase connections to the grid, while others primarily use a 3-phase connection. The following table showcases all of the possible charging methods available for charging a Genesis GV60 Premium. However, availability of certain charging modes may vary in different countries. That's why we recommend consulting your local electric vehicle charging networks to determine the charging options available to you.
Type 2 (Mennekes - IEC 62196)
Charging Point
Max. Power
Power
Time
Rate
Wall Plug (2.3 kW)
230V / 1x10A
2.3 kW
38 hours
10 km/h
1-phase 16A (3.7 kW)
230V / 1x16A
3.7 kW
23h45m
16 km/h
1-phase 32A (7.4 kW)
230V / 1x32A
7.4 kW
11h45m
33 km/h
3-phase 16A (11 kW)
400V / 3x16A
11 kW
8 hours
49 km/h
3-phase 32A (22 kW)
400V / 3x16A
11 kW †
8 hours
49 km/h
† = Limited by on-board charger, vehicle cannot charge faster.
Fast Charging (10 → 80%)
Fast charging is essential for extending the distance of your journey by adding an optimal amount of range in the shortest possible amount of time. However, once your electric vehicle reaches an 80% state-of-charge, charging power noticeably decreases. Therefore, a typical fast charge rarely exceeds an 80% SoC. The speed of charging an electric vehicle depends on both the charging station used and the maximum charging power that the EV can handle. The table below provides a comprehensive overview of fast charging the Genesis GV60 Premium.
Max. Power: maximum power provided by charge point
Avg. Power: average power provided by charge point over a session from 10% to 80%
Time: time needed to charge from 10% to 80%
Rate: average charging speed over a session from 10% to 80%
Note: The given energy consumption and range data, influenced by moderate driving and climate conditions, might not match actual driving experiences. Pricing info could vary across regions or markets. This site's content is for only informational purposes, not specifc advice for you.